What happens during RECD commissioning: a step-by-step walkthrough

By ZAN-F Engineering Team · 1 min read

1. Site survey and engineering

Our engineer inspects the DG room and exhaust line, records the DG rating and checks space, access and structural support. Back pressure is calculated and the device is sized and its mounting designed.

2. Supply and installation

Genuine Platino hardware is delivered to site. The crew erects the device, integrates it with the exhaust, adds insulation and cladding where needed, and wires the OBD panel. Typical installation takes one to three days per DG set.

3. Testing and verification

Before anything is signed off we measure back pressure, check emission performance, calibrate the OBD system and run the DG under load conditions. Any deviation is rectified and re-tested.

4. Commissioning and handover

We demonstrate performance to your team and brief the operators. You receive a documentation pack: test reports, certificates and installation photographs. Warranty is registered.

After handover

Periodic inspection and catalyst health checks keep the device performing. See our AMC and support service.

ZAN-F Engineering Team at ZAN-F, an authorized Platino dealer and SITC partner. Platino®, RECD, RATS® and related marks belong to Platino Automotive Pvt. Ltd. ZAN-F Power Systems is an authorized dealer.

Related reading

// Next step

DG compliance deadline approaching? Get a free site assessment this week.

Tell us your DG rating and location. We survey, size and quote, so you know exactly what compliance takes.

WhatsApp us
CallWhatsApp

Get a Quote

Tell us about your DG set. We reply the same working day.