Mechanical erection
Mounting frames and supports, lifting and positioning of the device, aligned to the survey drawings.
// Services · Stage 2
Genuine Platino hardware, erected and integrated by our own crew, with safety-compliant workmanship from the first bolt.
// What it covers
Typical duration is 1 to 3 days per DG set. We plan the work so your DG set is out of service for as short a time as possible.
Mounting frames and supports, lifting and positioning of the device, aligned to the survey drawings.
Connection to the existing exhaust line with correct flanges, joints and expansion allowances.
Thermal insulation and cladding for safety and to keep the plant room within temperature limits.
Sensor cabling and OBD panel wiring, terminated and labelled for the commissioning stage.
Site safety, permits and housekeeping handled as a standard part of the job.
// What you get
// Next step
Tell us your DG rating and location. We survey, size and quote, so you know exactly what compliance takes.